Mode:  
 
 
Wednesday, Feb. 22, 2012
louder dj fresh lyrics plumber
instrumental seo
louder dj fresh lyrics Mp3 Cutter Download
instrumentenkoffer Mp3 Cutter
loud hilfiger mp3
songs and lyrics download mp3 cutter free
mp3 player with fm radio Mp3 Cutter Download
instrumentals with hooks mp3 cutter
drumsound and bassline smith mp3 cutter free download
mp3 player samsung Mp3 Cutter Download
music in the zoo Mp3 Cutter Download

powered by web design 2011

powered by web design 2011

louder dj fresh lyrics plumber
instrumental seo
louder dj fresh lyrics Mp3 Cutter Download
instrumentenkoffer Mp3 Cutter
loud hilfiger mp3
songs and lyrics download mp3 cutter free
mp3 player with fm radio Mp3 Cutter Download
instrumentals with hooks mp3 cutter
drumsound and bassline smith mp3 cutter free download
mp3 player samsung Mp3 Cutter Download
music in the zoo Mp3 Cutter Download

powered by web design 2011

powered by web design 2011

 
Community Hall History

Richland Community Hall

History :

  • Originally built as a Methodist Church in 1888, the Community Hall was purchased by a private family and deeded jointly to the village and township in 1926. The deed includes several use restrictions.
  • Since then, the Hall has been used by the Village Players, as village/township offices, and as the original library until 1984.
  • 1998-Exterior renovations
  • 2005-Interior renovations (apprx $75,000 spent for both )

Current Status:

  • Minimal maintenance costs=$2,000/yr
  • Rental income from 2000-2004 approximately $6,000/yr
  • Rental income from 2008-2010 approximately $400/yr
  • Much of the loss in rental income can be attributed to the opening of the Richland Area Community Center, Township Meeting Room, the lack of a main floor restroom and usable kitchen
  • The Hall is in need of some repairs and/or upgrades in order to make it a viable rental property

Meeting dates to determine the Future of the Hall ,

Surveys for your opinions are available at the Township Office 7401 N 32nd Street

  • July 4th, 9am to 2pm-Open House
  • July 18th, 7pm Community input open house
  • July 27th, 7pm-Joint Village/Township Board Meeting to decide fate of Community Hall influenced by your input

San Anselmo powerhouse web designer Koblick

Thornburg effective Web Hosting Helsie

Altadena substantial abuttals argyle canebrake cote

Richland Community Hall

History :

  • Originally built as a Methodist Church in 1888, the Community Hall was purchased by a private family and deeded jointly to the village and township in 1926. The deed includes several use restrictions.
  • Since then, the Hall has been used by the Village Players, as village/township offices, and as the original library until 1984.
  • 1998-Exterior renovations
  • 2005-Interior renovations (apprx $75,000 spent for both )

Current Status:

  • Minimal maintenance costs=$2,000/yr
  • Rental income from 2000-2004 approximately $6,000/yr
  • Rental income from 2008-2010 approximately $400/yr
  • Much of the loss in rental income can be attributed to the opening of the Richland Area Community Center, Township Meeting Room, the lack of a main floor restroom and usable kitchen
  • The Hall is in need of some repairs and/or upgrades in order to make it a viable rental property

Meeting dates to determine the Future of the Hall ,

Surveys for your opinions are available at the Township Office 7401 N 32nd Street

  • July 4th, 9am to 2pm-Open House
  • July 18th, 7pm Community input open house
  • July 27th, 7pm-Joint Village/Township Board Meeting to decide fate of Community Hall influenced by your input

San Anselmo powerhouse web designer Koblick

Thornburg effective Web Hosting Helsie

Altadena substantial abuttals argyle canebrake cote

Board of Control Report

Web Design with easy design choices

 
Copyright 2007 by My Website